Our scope of works included:
- Design coordination and detailing of structural support systems
- Fabrication and installation of primary and secondary structural steel
- Installation of 3,000 m² of controlled-environment galvanised wall panels
- Integration with existing building fabric and live services
- Airtightness performance and quality assurance testing
- Full safety compliance and phased works within a live environment