ROSS Engineering delivered the detailing, fabrication, and supply of 460 MEP supports, designed and installed in a cleanroom environment.

Due to the complex geometry of several SHS frames, a high level of design accuracy and fabrication precision was required to ensure that all supports could be bolted directly into pre-existing Unistrut tracks embedded within the concrete slab.

This approach significantly reduced on-site installation time and supported the achievement of critical client handover and project milestone dates.

Our scope of works included:

  • Full detailed design of SHS ducting support frames
  • Precision offsite fabrication and pre-assembly
  • Integration with existing Unistrut track systems
  • Protective coating and finishing
  • Digital QA documentation and handover certification