ROSS Engineering was awarded the delivery of a small extension to the existing mechanical yard, along with the installation of 200m of new inspection catwalk within a live manufacturing facility. The works were carried out while maintaining full operational continuity, adhering to stringent safety, access, and regulatory requirements.

The project required careful coordination with facility operations to ensure that all construction activities were executed safely, efficiently, and with minimal disruption to critical manufacturing processes.

Our scope of works included:

  • Design and construction of the mechanical yard extension
  • Installation of 200m of new inspection catwalk for safe access and maintenance
  • Execution of works within a live, operational manufacturing environment
  • Strict adherence to facility safety procedures, access controls, and compliance standards
  • Coordination with site operations to avoid downtime or impact on production